| July 26, 2024 | Standard (routine) inspection | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of July 28, 2024. |
| July 26, 2024 | Standard (routine) inspection | Provide pharmaceutical services to meet the needs of each resident and employ or obtain the services of a licensed pharmacist. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of July 28, 2024. |
| July 26, 2024 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of July 28, 2024. |
| July 26, 2024 | Standard (routine) inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of July 28, 2024. |
| July 26, 2024 | Standard (routine) inspection | Make sure that a working call system is available in each resident's bathroom and bathing area. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of July 28, 2024. |
| August 27, 2025 | Standard (routine) inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of September 12, 2025. |
| August 27, 2025 | Standard (routine) inspection | Have a policy regarding use and storage of foods brought to residents by family and other visitors. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of September 12, 2025. |