| December 15, 2022 | Standard (routine) inspection | Honor the resident's right to request, refuse, and/or discontinue treatment, to participate in or refuse to participate in experimental research, and to formulate an advance directive. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Immediately tell the resident, the resident's doctor, and a family member of situations (injury/decline/room, etc.) that affect the resident. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Assure that each resident’s assessment is updated at least once every 3 months. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Ensure each resident receives an accurate assessment. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 23, 2023. |
| December 15, 2022 | Standard (routine) inspection | Assist a resident in gaining access to vision and hearing services. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Ensure that feeding tubes are not used unless there is a medical reason and the resident agrees; and provide appropriate care for a resident with a feeding tube. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Provide safe and appropriate respiratory care for a resident when needed. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Try different approaches before using a bed rail. If a bed rail is needed, the facility must (1) assess a resident for safety risk; (2) review these risks and benefits with the resident/representative; (3) get informed consent; and (4) Correctly install and maintain the bed rail. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of January 13, 2023. |
| December 15, 2022 | Standard (routine) inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of January 23, 2023. |
| May 28, 2024 | Standard (routine) inspection | Provide the appropriate treatment and services to a resident who displays or is diagnosed with mental disorder or psychosocial adjustment difficulty, or who has a history of trauma and/or post-traumatic stress disorder. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of June 7, 2024. |
| May 28, 2024 | Standard (routine) inspection | Develop and implement policies and procedures for flu and pneumonia vaccinations. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of June 7, 2024. |
| July 21, 2025 | Standard (routine) inspection | Assist a resident in gaining access to vision and hearing services. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 1, 2025. |
| July 21, 2025 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, widespread (F) | The home has a recorded correction date of August 1, 2025. |
| May 28, 2024 | Standard (routine) inspection | Coordinate assessments with the pre-admission screening and resident review program; and referring for services as needed. | Potential for minimal harm, pattern (B) | The home has a recorded correction date of June 7, 2024. |